Automation

Automation

Development of a universal test scheduler

Automation

Project

Incorporating efficiency improvement and test automation tasks into the software solution for testing electronic or telecommunication products, or for identifying errors in software development to introduce new solutions and paradigms.

 

Solution

  • Complement the basic testing software to allow schedulability, automation of tasks and parameterisation of the software solution for specific tasks.

 

Result

  • Improve the software, fix and refactor bugs and ensure its parameterizable use. Increasing testing efficiency and automation in new product manufacturing, reducing time risks.

Design and installation of the target machine

Automation

Project

Automation of the production of components for lamps used in water treatment plants, specification and concept development for the development of equipment. Design of the target machine and commissioning of the target machine as a complex solution with manufacturing.

 

Solution

  • Together with the client, the specification of the machine is developed, the filament assembly machine is designed, manufactured and commissioned in cooperation.
  • The need for  a quick and programmatic product changeover, due to the "many products in small quantities" nature of the project, was achieved through technology optimisation and design.

 

Technologies, tools used

  • Inventor 2018
  • SolidWorks 2018
  • EPLAN P8 2.6
  • FESTO QuickSearchPlus
  • Afag calculation & simulation programmes
  • Omron PLC programming language

Programming and building of N3D measuring system

Automation

Project

Construction and programming of an automatic measuring system that tests the inductances produced in large series at a rate equal to the one-second cycle time of the production line, at the level of the parameters that determine the goodness of the product , making an automatic decision and storing the collected data in a database. The project included a carefully designed graphical display and reporting of the data.

 

Solution

  • The built EOL test tower will work in conjunction with the handler being built in South East Asia.
  • The parameters measured are L, Q, R, , but it also performs a tensile test and an 8-point flatness test.
  • The mechanics manipulates the product to be measured in 400 ms, and the remaining 600 ms were available for measurements and data processing. rendelkezésre.

 

Result

A productive automated test system that efficiently and reliably serves the maximum quality demand placed on products.

Cookie settings

We use cookies to personalise content and ads, to provide social media features and to analyse website traffic. You can read more by clicking on the "Settings" button.
We use cookies to personalise content and ads.